Skip to main content
Back
1233 1234 1235 1236

A Period Residential Proprty in Edgbaston

This was a high specification interior design-led project we thoroughly enjoyed. It took the team over 8 months to complete the full decorations internally and externally of this property. Attention to detail was required in all aspects and in some challenging conditions.

Due to the proximity to the city centre the external render was coated in a self cleaning masonry product.

Internally we were required to hang textured paper and murals, spray ornate ceilings and cornice works, picking out the metal work to the stair case. The challenge was painting the 25m swimming pool’s ornate ceiling whilst the pool was partially full. We are proud to say the end results speak for themselves