Wentworth Golf Club

Client required a 6-8-week turnaround from complete closure to completion, to enable the BMW Open not to be affected in any way.

The main banqueting hall ceiling required extensive works to completely change its appearance from a rough sawn timber to a smooth opaque finish blending into the interior designers finishing scheme. The rest of the building was extensively remodelled leaving us with a very tight finishing period, after facilitating 24 hour working multi shifts practical completion was achieved on time.

The extensive use of fabric wallcoverings was referred to as stunning by the designer and client alike.