Greenwich Peninsula
Lucas has completed the decorations for a 1,000 homes at Greenwich Peninsula at the start of London’s largest single regeneration project, the massive Greenwich Peninsula regeneration plan.
The long term masterplan will eventually see the creation of almost 16,000 new homes on a 150 acre site, with over 35 acres of greenspaces and 1.6 miles of public frontage along the River Thames.
Our first packages were centred on the first two apartment buildings completed on the development and which rise to 22 and 23 storeys. Our first task was to apply specialist, durable protective coatings to all the basement areas including car parking, plant and service areas. Then we undertook a full, quality decorations package for 464 residential apartments.
In our second phase of working on the peninsula our decorations teams were deployed on three further buildings of 24, 28 and 29 storeys and completed a comprehensive programme for over 500 residential units ranging from studios to three-bedroom apartments.
We successfully completed these early phase packages within a year. The project was led by the Principal Contractor, Mace, and the developer was Knight Dragon.
The long term masterplan will eventually see the creation of almost 16,000 new homes on a 150 acre site, with over 35 acres of greenspaces and 1.6 miles of public frontage along the River Thames.
Our first packages were centred on the first two apartment buildings completed on the development and which rise to 22 and 23 storeys. Our first task was to apply specialist, durable protective coatings to all the basement areas including car parking, plant and service areas. Then we undertook a full, quality decorations package for 464 residential apartments.
In our second phase of working on the peninsula our decorations teams were deployed on three further buildings of 24, 28 and 29 storeys and completed a comprehensive programme for over 500 residential units ranging from studios to three-bedroom apartments.
We successfully completed these early phase packages within a year. The project was led by the Principal Contractor, Mace, and the developer was Knight Dragon.